SuperBike Preparation (Continued)

Installed the Yoshimura Cams and kit head gasket in to engine number 2.

Hopefully be able to collect engine number 1 from Tim Radley tomorrow.

IMG_0591

Checking out how the shiny bits fit together so Harris Performance can make sure the yokes fit and they can machine up some wheel spacers.

IMG_0599

Our wheels aren’t here so had to borrow some to get a head start.

IMG_0601

This entry was posted in 2009, Mike Edwards, Photos. Bookmark the permalink.